
据世界能源新闻5月12日消息称,BP周二表示,其阿塞拜疆项目的石油产量从一年前的57.1万桶/天降至2020年第一季度的52.4万桶/天。
BP牵头的财团在一份声明中说,阿塞拜疆-奇拉格-古尼什利(ACG)油田的伴生气的季度产量为790万立方米,高于去年同期的520万立方米。
这些油田占阿塞拜疆石油产量的绝大部分。
该财团表示,第一季度在ACG油田的运营支出约为1.5亿美元,资本支出为5.22亿美元。
该财团表示,今年第一季度,其阿塞拜疆子公司在Shah Deniz油田生产了约47亿立方米天然气和100万吨凝析油,高于去年同期的43亿立方米和约100万吨。
曹海斌 摘译自 世界能源新闻
原文如下:
BP's Azerbaijan Output Drops
BP said align="justify">Associated gas output at the Azeri-Chirag-Guneshli (ACG) oilfields was 7.9 million cubic meters in the quarter, up from 5.2 million cubic meters a year ago, the BP-led consortium said in a statement.
The oilfields account for most of Azerbaijan's oil production.
The consortium said it spent about $150 million in operating expenditure and $522 million in capital expenditure align="justify">The consortium said that its Azeri units produced about 4.7 billion cubic meters (bcm) of natural gas and 1 million tonnes of condensate at the Shah Deniz field in the first quarter, up from 4.3 bcm and about 1 million tonnes a year ago.
本文来源 网站,文章版权归原作者及原出处所有,内容为个人观点,并不代表本站赞同其观点和对其真实性负责,本站只提供参考并不构成任何投资及应用建议。我们已经尽可能的对作者和来源进行了通告,如有异议请及时联系我们,我们将根据著作权人的要求,立即更正或者删除有关内容。
本文内容为作者个人观点,OILUP仅提供信息发布平台